Skip to: Curated Story Group 1
Visually Open Nav.
US
APAC
EUROPE
subscribe
Home
Sections
Sections
Architectural Glass
Building Restoration and Maintenance
Commercial Contractors
Concretes, Aggregates and Construction Materials
Construction Cladding
Construction Consulting
Construction Engineering Services
Construction Equipment
Construction Forensic and Owners Representative
Construction Insulation, Coating and Waterproofing
Construction Interiors
Construction Staffing
Doors and windows
Flooring System
HVAC
Kitchen and Bath
Mechanical Electrical and Plumbing
Modular and Prefab Construction
Outdoor Construction
Pre-Construction Services
Residential Construction
Roofing and Siding Systems
Specialty Construction
Wall Systems
Contributors
Vendors
News
Conferences
Newsletter
About
CXO Awards
Welcome back to this new edition of Construction Business Review !!!
✖
Sign In
Subscribe to our Weekly Newsletter to get latest updates to your inbox
August 2023CONSTRUCTIONBUSINESSREVIEW.COM9companies. Those companies started to request 12m clear height and six-ton slabs, and sometimes cross-docking facilitiesso that they could operate in a more efficient space.Still talking about the product, in the last few years we see a strong development of last mile, transit point, and cross-docking facilities all of those to accommodate new e-commerce demands.The big challenge that we face right now is keeping up with the demand, facing the increase in construction costs as we saw in the past years, especially steel and diesel-related services and materials.With that in mind, we were able to see different opportunities, some of them of re-positioning old facilities.Facing this kind of challenge can be even more difficult than developing from scratch: when you start a greenfield development you know what you are going to face you have all the surveys, you designed everything, and you plan each and every activity.When you decide to take an old building and change its configuration (as we see in the picture below in this case, we decided the cut the roof and the structure of the building to create a new avenue, adding value to the property) we have to dig deeper, checking the original design, making sure the construction respected the original design, creating a new design that structurally works, making sure that the technical performance is achieved.In addition to that, we have to plan each and every activity to be confident in the execution sequence, making sure that all the health and safety requirements are followed. This takes a lot of technical expertise, energy, and dedication.2023 has started with a very challenging scenario in our country: a new President, with a questionable track record, and a very unstable macroeconomic situation.In the first week of January, we received news about another increase in steel costs the truth is, we could not predict that in our models and we will have to be creative to overcome this new challenge without impacting our results.Fortunately, anyone that has had the opportunity of working with Brazilians got to see something very special about our people: we are very energetic and resilient and we NEVER give up. For that reason I believe the world is going to see a big evolution in the logistics Brazilian real estate sector, even facing all the challenges mentioned before. Orignal ware houseRetrofitExample of an obsolete warehouse renewed in 2022 - GuarulhosWith all the new real estate fundsdevelopment, international companies started investingindevelopments in our country, seeing this huge opportunityto invest in a more structured manner, bringing best-in-classspecifications for international occupiers.
<
Page 8
|
Page 10
>