Skip to: Curated Story Group 1
constructionbusinessreview
    • US
    • APAC
    • EUROPE
  • Home
  • Sections Sections
    Architectural Glass
    Building Restoration and Maintenance
    Commercial Contractors
    Concretes, Aggregates and Construction Materials
    Construction Cladding
    Construction Consulting
    Construction Engineering Services
    Construction Equipment
    Construction Forensic and Owners Representative
    Construction Insulation, Coating and Waterproofing
    Construction Interiors
    Construction Staffing
    Doors and windows
    Flooring System
    HVAC
    Kitchen and Bath
    Mechanical Electrical and Plumbing
    Modular and Prefab Construction
    Outdoor Construction
    Pre-Construction Services
    Residential Construction
    Roofing and Siding Systems
    Specialty Construction
    Wall Systems
  • Contributors
  • Vendors
  • News
  • Conferences
  • Newsletter
  • About
  • Awards
Welcome back to this new edition of Construction Business Review !!!✖
Sign In

Subscribe to our Weekly Newsletter to get latest updates to your inbox
AUGUST - 2023CONSTRUCTIONBUSINESSREVIEW.COM9to far more substantial and tangible operations that are now planned into the job from the beginning, and more recently, factored into estimating. Tunnels and bridges are modelled in three dimensions with accurate scalability, allowing teams to envision and design systems in real-time as they prove their concepts against conflicts with other trades. Lighting and ITS systems are designed, laid out, prebuilt and tested before being transported to the site. In the transportation construction industry, contractors now look to prefabrication to drag repetitive, laborious, critical tasks to the left of the project CPM. Contractors are working with designers, engineers, and AHJs to make design changes and address means and methods that better cater to leveraging the strengths of prefabrication. Strengths such as schedule management and constructive acceleration, reduction of strenuous physical activity, and the added Quality benefits of build-out in a monitored and controlled environment. Specific to the transportation and outdoor electrical industry, prefabrication is greatly reducing the exposure time for crews in dangerous active roadways and densely populated construction sites.What Comes NextThe future of prefabrication is bright and ever-evolving. Project Managers, leaders, and executives should be on a constant lookout for opportunities and new ways to leverage the ability to better control their schedules and improve their Quality programs. As with prefabrication opportunities in any industry, this approach requires a heavier team engagement on the front end to save time and effort, as well as to mitigate risk on the back end. Managers need to ensure their negotiated Schedule of Values and AHJs are conducive to stored material invoicing. Chain of custody procedures and modelling/detailing becomes expected expenses at the onset of the project. Every opportunity that can be brought from the back end of a project to the front helps the team maximize project success. Every risk that can be identified early on and mitigated, or eliminated is a win for any project team. Contractors with advanced prefabrication capabilities are already beginning to reach out to design firms early on in project development cycles to attempt to add their specific capabilities and delivery methods into projects that may still be years out from the execution and delivery phases. It will be interesting to see what innovative, collaborative, and intuitive prefabrication trends develop over the next decade as more companies and AHJs begin to buy into the buzz. There is no longer a question as to whether prefabrication efforts can enhance project success; the most successful contractors in the coming decade will be the ones who maximize this Identified potential. The future of prefabrication is bright and ever-evolving. Project Managers, leaders, and executives should be on a constant lookout for opportunities and new ways to leverage the ability to better control their schedules and improve their Quality programs
< Page 8 | Page 10 >