Skip to: Curated Story Group 1
constructionbusinessreview
    • US
    • APAC
    • EUROPE
  • Home
  • Sections Sections
    Architectural Glass
    Building Restoration and Maintenance
    Commercial Contractors
    Concretes, Aggregates and Construction Materials
    Construction Cladding
    Construction Consulting
    Construction Engineering Services
    Construction Equipment
    Construction Forensic and Owners Representative
    Construction Insulation, Coating and Waterproofing
    Construction Interiors
    Construction Staffing
    Doors and windows
    Flooring System
    HVAC
    Kitchen and Bath
    Mechanical Electrical and Plumbing
    Modular and Prefab Construction
    Outdoor Construction
    Pre-Construction Services
    Residential Construction
    Roofing and Siding Systems
    Specialty Construction
    Wall Systems
  • Contributors
  • Vendors
  • News
  • Conferences
  • Newsletter
  • About
  • Awards
Welcome back to this new edition of Construction Business Review !!!✖
Sign In

Subscribe to our Weekly Newsletter to get latest updates to your inbox
DECEMBER 2022CONSTRUCTIONBUSINESSREVIEW.COM9for disruption of the bridge. In general, risk analysis covers several activities to be carried out, all aiming at somehow quantifying the considered risk ­ in this case, safety for users of the bridge and availability of the bridge in operation. The risk activities run through the following procedure. As seen from the sketched procedure, the operational risk analysis includes identification of hazards ­ events that under various circumstances will lead to accidents in terms of human injuries/fatalities and/or to a closure of the bridge in a period. Examples are ordinary traffic accidents, truck fires and ship collisions with pontoons or girders. The hazard identification activity must hence cover all imagined types of accidents, why the identification process often includes workshops with experts within various fields.When hazards are identified the risk analysis part is initiated. This includes analysis of the identified hazards to determine how often the hazard will occur (often based on statistics and presented as occurrences per year) and also modelling of the consequences, if the hazard appears. Consequences will be expressed as number of fatalities or number of down time hours of the bridge given the accident. The consequence modelling part may also be based on statistics but often are more detailed models used (e.g., computational models to estimate fires and toxic releases, structural models to estimate damages due to ship collisions). By combining the frequency and the consequence for a given hazard, a risk contribution in terms of number of fatalities per year or number of disruption hours per year is estimated.The final risk is then calculated by summing up all risk contributions and compared to an established risk acceptance criterion. This criterion may be given by national authorities setting the limit for annual number of user fatalities for the considered structure. However, often such criteria are not available and may be set when starting up the project. A commonly used approach is to allow the same number of annual fatalities as seen on comparable projects ­ or to strengthen requirements just a little to increase safety. When looking at disruption periods this may be more locally determined and depends very much on the traffic patterns close to the bridge and the consequence for the users not being able to use the bridge and hence must take other delaying routes.The procedure has been applied at the Bjørnafjorden Floating Bridge and gives a fine overview of which hazards contribute to the overall risk and shows if the established acceptance criteria have been violated. This is illustrated below (numbers just indicative for illustration purpose). The figures above shows that different hazards are dominating the risk depending on the risk type. For human safety traffic accidents contributes the most, whereas ship collisions are the largest contributor to the risk of disruption of the bridge. If it turns out that the overall risk is not acceptable or if specific scenarios contribute significant to the risk, risk reduction should be implemented ­ that may be increased structural capacity, alternative lane design, access for emergency response, lowering speed limits at the bridge etc.This risk-based approach is an ongoing activity from the very beginning and over the entire lifetime of the bridge. The procedure assists designers in choosing optimal design, contractors to optimize during construction and operators to ensure that the right maintenance activities and operational rules are in place. 1,00E-061,00E-051,00E-041,00E-031,00E-021,00E-01Ship collisionsPlane collisionsNatural hazardsTraffic accidentsNumber of fatalies per year1,00E-041,00E-031,00E-021,00E-011,00E+00Ship collisionsPlane collisions Natural hazardsTraffic accidentsNumber disrup on days per year
< Page 8 | Page 10 >