Skip to: Curated Story Group 1
constructionbusinessreview
    • US
    • APAC
    • EUROPE
  • Home
  • Sections Sections
    Architectural Glass
    Building Restoration and Maintenance
    Commercial Contractors
    Concretes, Aggregates and Construction Materials
    Construction Cladding
    Construction Consulting
    Construction Engineering Services
    Construction Equipment
    Construction Forensic and Owners Representative
    Construction Insulation, Coating and Waterproofing
    Construction Interiors
    Construction Staffing
    Doors and windows
    Flooring System
    HVAC
    Kitchen and Bath
    Mechanical Electrical and Plumbing
    Modular and Prefab Construction
    Outdoor Construction
    Pre-Construction Services
    Residential Construction
    Roofing and Siding Systems
    Specialty Construction
    Wall Systems
  • Contributors
  • Vendors
  • News
  • Conferences
  • Newsletter
  • About
  • CXO Awards
Welcome back to this new edition of Construction Business Review !!!✖
Sign In

Subscribe to our Weekly Newsletter to get latest updates to your inbox
OCTOBER 2024CONSTRUCTIONBUSINESSREVIEW.COM8IN MYOPINIONPREFABRICATION, MODELLING, AND THE MODULAR FUTURE OF ELECTRICAL AND INTELLIGENT TRANSPORTATION SYSTEMS IN CONSTRUCTION By Daniel Cole, PMP, Senior Project Manager, Aldridge Electric, IncWhile prefabrication has been the buzzword in construction for quite some time now, the implementation and scale of this philosophy have only more recently begun to be realized. With regards to the electrical and Intelligent Transportation Systems (ITS) industries specifically, this area has seen explosive real growth in recent years and the future looks to capitalize even more on this trend. Where We've Been The early days of the prefabrication trend in outdoor lighting and electrical were more a model of leveraging supplier and vendor capabilities than any real, all-encompassing strategy to reimagine project delivery. Suppliers began to offer lights as a "kit" in which the wire was precut and labelled according to the project documents, saving the installer only minimal time in the field.
< Page 7 | Page 9 >