CLOSE
  • Foundation Construction Canada
  • Construction Consulting Europe
  • Mechanical Contractor Canada
  • Mould Remediation and Testing Europe
  • Swimming Pool Construction APAC
  • Building Sealing Solutions Europe
  • Kitchen and Bath
  • Decking Canada
  • MEP APAC
  • Construction Saudi Arabia
  • Construction Law APAC
  • Outdoor Construction
  • Construction Coating Europe
  • MEP Canada
  • Apartment and Condominium Contractors Canada
  • Cold Storage Construction APAC
  • Precast Concrete Europe
  • Construction Staffing Europe
  • Pre-Construction Services
  • Flooring System APAC
  • Scaffolding Canada
  • Swimming Pool Construction Canada
  • Construction Management Canada
  • Residential Construction
  • Systems
  • Structures
  • Professional Services
  • Construction Forensic and Owners Representative Europe
  • Buinding Restoration and Maintenance Europe
  • Modular and Prefab Construction Europe
  • Construction Interiors Europe
  • Outdoor Construction Europe
  • Pre-Construction Services Europe
  • Building Restoration and Maintenance Canada
  • Cold Storage Construction Canada
  • Concrete Canada
  • Construction Cladding APAC
  • Concretes, Aggregates and Construction Materials APAC
  • Concretes, Aggregates and Materials Europe
  • Commercial Contractors Europe
  • Commercial Contractors APAC
  • Dummy
  • Flooring Systems Europe
  • Construction Management APAC
  • Landscaping Canada
  • Construction Engineering Services
  • Construction Bidding and Auctions
  • Mechanical Electrical and Plumbing
  • Roofing and Siding Systems Europe
  • Architectural Glass APAC
  • Startups APAC
  • Forensic and Owners Representative
  • Flooring System
  • Waterproofing APAC
  • Wall Systems
  • Safety and Compliance Europe
  • Architecture and Design Services
  • Modular and Prefab Construction
  • Architectural Glass
  • Construction MENA
  • Construction Demolition and Recycling Europe
  • Construction Interiors
  • Kitchen and Bath Europe
  • Steel Building APAC
  • HVAC
  • Doors and windows
  • Roofing and Siding Systems
  • Modular Construction Canada
  • Insulation, Coating and Waterproofing
  • Building Information Modeling APAC
  • Architectural Glass Canada
  • Construction Law
  • Sustainable Construction APAC
  • Building Restoration and Maintenance
  • Commercial Contractors
  • Specialty Construction
  • Construction Engineering Canada
  • Construction Engineering MENA
  • Specialty Construction Europe
  • Modular Construction APAC
  • Construction Marketing
  • Construction Latam
  • Workforce Management and Staffing
  • Roofing Systems APAC
  • Construction Consulting
  • Steel Building Europe
  • Construction Demolition and Recycling APAC
  • Safety and Compliance APAC
  • Concretes, Aggregates and Materials
Skip to: Curated Story Group 1
Construction Business Review
US
EUROPE
APAC
CANADA
MENA
LATAM
AUSTRALIA
About Us Conference Advertise With Us
  • APAC
    • US
    • EUROPE
    • CANADA
    • AUSTRALIA
  • Home
  • Sections
    Architectural Glass
    Building Information Modeling
    Cold Storage Construction
    Commercial Contractors
    Concretes, Aggregates and Construction Materials
    Construction Cladding
    Construction Demolition and Recycling
    Construction Law
    Construction Management
    Flooring System
    MEP
    Modular Construction
    Roofing Systems
    Safety and Compliance
    Startups
    Steel Building
    Sustainable Construction
    Swimming Pool Construction
    Waterproofing
  • Leadership Perspectives
  • Insights
  • News
  • CXO Awards

Thank you for Subscribing to Construction Business Review Weekly Brief

  • Home
  • Leadership Perspectives

Pepper Construction Company

Corey Zussman, Director of Quality Management

Lightweight Concrete Finishing Concern - Defining a Better Way to Specify

Corey Zussman

Corey Zussman

Several years ago, a colleague of mine from another contractor experienced a floor failure, where the adhered flooring to the concrete top surface separated from the concrete slab throughout the floor. The floor was in use at the time of failure, which affected the owner's operations. The concrete was lightweight, with an air content of 7 percent and a hard-troweled surface, all within specifications. The investigation determined that air bubbles had aligned just below the top surface of the concrete and, after a few weeks of use, failed and caused the floor to debond. Learning from that event, our quality department checklist now reviews this scenario before construction.


Exploring the Details Can Lead To Enhanced Specifications


Knowing how specific concrete curing and finishing practices benefit or negatively affect the flooring installation process allows us to improve overall performance while saving the project time and money. Being proactive in identifying specific issues and taking into account all the materials to be installed and in what sequence requires thinking beyond the current moment of construction. We must understand the next step of construction installation and how each component will interact with the next component in the sequence. For example, how will curing and finishing concrete affect the flooring installation? It's important to look beyond the team's focus on performing the task at hand and consider the consequences of each installation step.


Floor-finishing techniques are often overlooked in regard to the type of concrete being used, and different types of concrete will be negatively affected when the wrong finishing method is applied.


Concrete curing should be job-specific and dependent on the next sequence of work. Installing chemical curing compounds can have a negative effect on floor leveling or floor-finish installation, which needs to be evaluated and reviewed before the curing technique is used on-site.


Recently, I conducted a quality department pre-installation meeting for interior concrete slabs of a steel and concrete mid-rise medical office building in downtown Chicago. We discussed the mix design for the lightweight concrete slabs, reviewing each component and comparing the mix design to the job specifications. During the discussion, it was identified that the concrete had an air entrainment of 4-7 percent, which is typical of an exterior concrete slab but not an interior. It was determined that 4-7 percent air entrainment is typically required for lightweight concrete to meet the specified concrete weight of 90-115 PCF compared to normal-weight concrete, which is 140-150 PCF. As noted in ACI 302, Guide to Floor and Slab Construction, published by American Concrete Institute, air-entrained concrete over 3 percent should not be overly troweled or hard troweled; otherwise, the air bubbles that are created during the air entrainment process will tend to line up just below the surface of the concrete and make a weak plane that could easily debond from the concrete surface as previously described.


As we continued the specification review during the meeting, we noticed that the concrete specifications call for a floor flatness of 35 (FF35). While FF35 is typical for flooring applications, to achieve an FF35, the floor must be hard-troweled, which creates a weak surface in lightweight concrete with air entrainment of over 3 percent and is unsuitable for any floor installation.


It is easy to overlook the finishing needs and flatness requirements with this sequence of specified materials and understand the consequences of the installation techniques required to achieve what is specified for installation. If we had finished the concrete as specified, with an FF35, we likely would have created a path for floor failure.


Offering Additional Insights


We seldom see the consequences of how one trade affects another with regard to concrete finishing and floor installation. As a result, it is critical that this be one of the items reviewed during our quality pre-installation meetings.


Collaborating with the designers, structural engineers and concrete suppliers, we can change how the industry specifies lightweight concrete slabs to better interact with the down-line trades.

 


Through our quality program, associated processes and coordination meetings, we have developed several strategies to address these concerns with the designer and installer. We now recommend the following changes to the specifications, whichhelp to avoid the potential for a multi-million-dollar flooring disaster:


1. Use normal-weight concrete if the structure and building fire design allow.


2. If lightweight concrete is required (as noted in #1), reduce the floor flatness (FF) specifications to FF20, which could be achieved with a lighter finishing technique that will not create a weak top surface. The remainder of the flatness that is required for the flooring would be made up of a thin engineered floor topping.


3. If lightweight concrete is required (as noted in #1), reduce the allowed air content in the concrete slab mix design. A concrete design of a 3 percent air content maximum will increase the overall weight of the concrete to about 2 PSF (pounds per square foot) for a 6" slab and maintain a 114 PCF (pounds per cubic foot) design rather than 110 PCF.


Collaborating with the designers, structural engineers, and concrete suppliers, we can change how the industry specifies lightweight concrete slabs to interact better with the down-line trades. Going through the entire construction process, including discussing the next step of construction with the stakeholders, will educate and provide a better set of job-specific specifications that work for the initial to final installations.


Putting together the down-line scenario and catching issues before they become concerns is critical to a successful project. Having a quality program in place with an experienced team that can review the work before it commences benefits the project and all companies involved.


The articles from these contributors are based on their personal expertise and viewpoints, and do not necessarily reflect the opinions of their employers or affiliated organizations.
EDITOR'S CHOICE
  • Willis Towers Watson

    Cushman & Wakefield [NYSE: CWK]

    Projects Today Come Down to Nerves of Steel and Realistic Expectations

    Jason D’Orlando, Senior Managing Director, and Michael Morehead, Senior Director, Project and Development Services - Industrial

  • Willis Towers Watson

    Walmart [NYSE: WMT]

    Navgating the Challenges and Innovations in Mega Construction Projects: Building Competent Leadership and Embracing Technological Trends

    Seth Roy, Senior Director - Design & Construction, Walmart [NYSE: WMT]

  • Willis Towers Watson

    Meritage Homes

    Act Now to Address Aging Workforce

    Poli Peters, VP of Operations[NYSE: MTH]

  • Willis Towers Watson

    Advanced Drainage Systems [NYSE: WMS]

    Walking the sustainability walk: The case for EPR

    Brian King, EVP Marketing, Product Management and Sustainability, Advanced Drainage Systems, Inc. [NYSE: WMS]

Read Also

Unlocking Your Potential: 5 Keys to Advancing Your Career in Property Management

Leanne C. Reynolds, Director, Property Management, Colliers [NASDAQ: CIGI]
Unlocking Your Potential: 5 Keys to Advancing Your Career in Property Management

The Internet of Drones: Redefining Construction in the age of Intelligence

Paul Doherty, President and CEO, the digit group, Inc.
The Internet of Drones: Redefining Construction in the age of Intelligence

From Incident to Insight in Safety Leadership

Matthew Shearer, Director of Environmental Health & Safety, Cash Construction Company, Co.
From Incident to Insight in Safety Leadership

Building Successful Construction Projects With Clarity And Proactiveness

Victor Young, SVP - Development/Construction Management, Kairoi Residential
Building Successful Construction Projects With Clarity And Proactiveness
Keeping Projects on Track: Goals, Balance, Code, Technology, and Leadership

Keeping Projects on Track: Goals, Balance, Code, Technology, and Leadership

Daniel G. Murtagh, Vice President of Engineering, BXP
Building Strong Safety Cultures Across Complex Construction Projects

Building Strong Safety Cultures Across Complex Construction Projects

Curtis Corley, Director of Safety - South, AECOM Hunt

The Data Driven Builder

George Watts, Director of Project Management, SLS Consultants
The Data Driven Builder

Building Projects through People, Planning and Culture

Ben McCafferty, Project Manager, Shook Construction
Building Projects through People, Planning and Culture
Loading...
Copyright © 2026 Construction Business Review All rights reserved. |  Subscribe |  Newsletter |  Sitemap |  About us|  Editorial Policy|  Feedback Policy|  Methodologyfollow on linkedin
This content is copyright protected

However, if you would like to share the information in this article, you may use the link below:

https://www.constructionbusinessreviewapac.com/leadership-perspective/lightweight-concrete-finishing-concern-defining-a-better-way-to-specify-nwid-1352.html

We use cookies on this website to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. More info

I agree